Day: August 5, 2025

Tues. Aug. 5, 2025 – more work, and progress if the weather is nice

Humid. Oh my. 75F last night and dew was condensing on me, my radio, and everything else too. The rain started around 8am, stopped around 11am, and the sun poked through occasionally. Dusk was very nice. I’m hoping today lets everything dry off and lets me keep working on my walkway.

I couldn’t work on it yesterday, so I did a bunch of grading and roadway repair for the common area. I also did some for myself. There was a gutter separating the street from my driveway that had filled in with the road base material. It’s supposed to divert some of the water that otherwise pours down my sloped driveway and into the garage. Hopefully the restored gutter will help control that again. It will fill back up with time, but maybe I can keep it clear now that I’ve used the machine to dig it out. I took several cubic yards of material and put it in other eroded areas.

Today, if it’s dry, I’ll try to get more stuff done on the walkway. If not, I’ll do some of the other earthmoving stuff on my property. Flexibility and a really long list of things I could do if I have time will keep me moving.

Always be working… and stacking.

nick

Read the comments: 52 Comments
// ------------------------------------------------------------------------------- // end of file archive.php // -------------------------------------------------------------------------------